A Step-by-Step Guide to Installing the Weltrus 50kW/100kWh Energy Cube

Introduction:
Installing a commercial-scale battery energy storage system (BESS) might seem complex, but with the right guidance, it’s a straightforward process. The Weltrus 50kW/100kWh Energy Cube is designed for efficiency, both in operation and installation. This guide will walk you through the eight essential steps to get your system up and running, ensuring a safe and successful deployment.

The 8-Step Installation Process:

  1. Unpacking and Inspection:
    The process begins with a careful unboxing. Check all components against the packing list to ensure everything, from bolts to cables, is present and undamaged.

  2. Mounting the Bracket:
    Secure the system’s foundation. Using the provided bolts, firmly attach the mounting bracket to a solid, level surface to support the inverter’s weight.

  3. Installing the Inverter:
    With the bracket in place, carefully lift the inverter and align its rear track groove with the mount bracket. This secure hanging mechanism ensures a stable fit.

  4. Electrical Connection Preparation:
    Open the unit’s cover to access the internal connection compartment. Carefully take out the pre-provided power cables to prepare for the next steps.

  5. Port and Cable Installation:
    This is the core electrical step.

    • Connect the BACK-UP port terminals (L, N).

    • Connect the ON-GRID port terminals.

    • Crucial Note: The ON-GRID side has 5 wires. Each must be inserted into its correct terminal slot. Incorrect insertion can cause system failure.

    • Connect the battery power cables.

    • Install the communication module and data cables for system monitoring.

  6. Equipment Inspection:
    Before startup, conduct a thorough inspection. Double-check all mechanical fittings and electrical connections for tightness and correctness. Verify there are no loose tools or debris inside the unit.

  7. System Startup:
    Once everything is confirmed secure, proceed to power on the system according to the manufacturer’s startup sequence provided in the detailed manual.

  8. Completion:
    With the system activated and communicating with your monitoring platform, the installation is complete.

Conclusion: Reliability Made Simple
The Weltrus Energy Cube’s installation process is a testament to its user-centric design. By following these structured steps, installers can ensure a reliable and efficient energy storage solution for their commercial, industrial, or utility-scale clients.

Become a Weltrus Partner!
Are you impressed by the simplicity and power of the Weltrus Energy Cube? We are actively seeking global distributors and dealers to join our network. We offer a range of specifications to meet diverse market needs and provide comprehensive support to our partners.

Contact us today at [email protected] to discuss partnership opportunities and bring leading energy storage solutions to your region.

WhatsApp

+86-13735502672

Talk to our experts

  • We will contact you within 12 hours
  • Don’t worry, we hate spam too!