Weltrus Electrical Control Components: Certifications and Scope

Published: November 21, 2026 | Author: Weltrus Energy Team

A DC contactor, a circuit breaker, and a relay on a gray bench with labels facing away

Key Takeaway

Buyers ask Weltrus about high-voltage DC contactors, DC breakers, thermal overload relays, and related balance-of-system devices for solar and storage. A certification applies only to the models named in that certificate or declaration. Request the PDF that matches the part number. This page does not publish UL, TUV, or CE certificate numbers, and it does not treat a mark as present unless the datasheet and the PDF show it.

When One Logo Is Asked to Cover the Whole Bill of Materials

An RFQ for a solar or storage project often mixes devices that look similar in a photograph and do different jobs in the circuit. The high-voltage DC contactor opens the battery on command. The DC breaker or fuse clears a fault. The thermal overload relay watches an AC motor. A string disconnect isolates a photovoltaic circuit. Buyers then ask for “the certifications” as if one PDF could sit behind every line.

The file fails in a predictable way. A quality-management certificate for a factory is filed as if it were a product listing. A Declaration of Conformity for one contactor series is treated as cover for a breaker. A mark printed on a slide is accepted without the PDF that names the holder, the standard, and the models. Later, a lender or an inspector asks for the page that lists the exact part number on the purchase order, and that page is not in the folder.

Scope is the fix. Each document has a job and a boundary. The datasheet sets the electrical rating of one part number. The product certificate or declaration names the models that were assessed and the standards used. The factory certificate names a quality system at a site. None of the three borrows the contents of the others.

The Component Families and What Each One Does

These are the families buyers ask Weltrus to quote for solar and storage balance of system. The description is the function. It is not a claim that every mark, voltage, or frame exists on a Weltrus datasheet. The datasheet for the offered part number is the rating.

A high-voltage DC contactor is a coil-operated switch for a DC circuit. In storage it is typically the main contactor or the precharge contactor. It makes and breaks the currents its datasheet lists. It is not a fuse. Product evidence, when a buyer requires it, is usually read against IEC 60947-4-1 or the equivalent the certificate names. The utilization category and the voltage on that page have to match the battery bus, not a lower-voltage example.

A DC breaker is selected when the circuit needs a switching device with a stated short-circuit rating. Molded-case breakers that are marked for AC only are not DC breakers. DC ratings include voltage, polarity, and interrupting duty under IEC 60947-2 or the standard printed on the product file. A contactor certificate does not supply those interrupting numbers.

A thermal overload relay protects a motor against overload. It is used with an AC contactor. The relay detects the current and opens the contactor coil circuit. It is the wrong device for a photovoltaic DC string and the wrong device for a battery short circuit. The relevant product standard in the IEC low-voltage series is again IEC 60947-4-1, this time for the overload relay associated with the contactor. Trip class and setting range come from the datasheet of that relay part number.

Related balance-of-system devices show up on the same projects: DC disconnect switches for PV strings, fuses marked for photovoltaic service, and surge protective devices. A PV switch-disconnector is read under IEC 60947-3, often with utilization category DC-PV1 or DC-PV2. Those categories are not interchangeable with a contactor’s DC-1 line. When the RFQ adds them, give each line its own part number and its own PDF. Do not fold them into the contactor certificate because they land in the same enclosure.

Which File Answers Which Question

Collect one row per part number. If a cell is empty, the scope is not finished. Do not fill an empty cell with a certificate number from a different product or from memory.

File Question it answers What it does not answer
Datasheet for the part number Voltage, current, polarity, trip or break duty, coil data, and derating printed for that model Whether a certification body assessed the model
Product certificate or authorization page Holder, standard, and the models inside the scope, as the PDF prints them A rating the datasheet does not show; a sibling part that is absent from the model list
Declaration of Conformity The manufacturer’s statement of directives and standards for the named models A third-party file number, unless the declaration attaches one
Factory quality certificate, such as ISO 9001 That a named site runs a quality system within the certificate scope Product listing, interrupting rating, or a mark on the device
Label and marking drawing Which marks the manufacturer applies to that part number A mark that appears only on a catalog cover

A single high-voltage DC contactor on a gray background with the label facing away

Read the difference between a listing, a component recognition, and a declaration before you write the RFQ sentence. A listed device is evaluated for a stated application and marked as the certification file requires. A recognized component is evaluated for use inside other equipment, often with conditions of acceptability that the end equipment must still meet. A Declaration of Conformity is not the same document as a TUV type certificate. If the destination market requires one of these and not the others, name that document. Do not write “UL, TUV, and CE” as a single phrase and expect one PDF to satisfy all three.

System files sit one level above the component. A battery system evaluated under a system standard is not, by that fact, a listing of the contactor inside it. The component still needs its own datasheet and, where you require it, its own certificate scope. Quote the component part number in the purchase order even when the project also holds a system report.

How to Match the Part Number to the PDF

Use the same character string in four places: the purchase order, the datasheet header, the label, and the model list inside the certificate or declaration. A series name that is almost the same is not a match. Suffixes for coil voltage, auxiliary contacts, and current range create different part numbers. The scope must include the suffix you will receive, or the PDF must explain that the suffix is covered by a stated family rule. If that sentence is missing, ask for it in writing. Do not invent the rule.

  1. Identify the legal holder on the certificate and the seller on the contract. If they differ, ask which entity is responsible for the declaration.
  2. Read the scope paragraph, not only the logo at the top. Note the standard number and the year or edition if the PDF prints them.
  3. Find the part number in the model list. Highlight it. If you cannot find it, the certificate is for something else.
  4. Read conditions and limitations. Altitude, enclosure, polarity, and surrounding fuse type often sit in the conditions. They limit how you may apply the mark.
  5. Check dates on the PDF itself. Issue and expiry are whatever that file prints. This article does not state a date for any Weltrus certificate.
  6. Pair the PDF with the datasheet revision you will buy. A certificate for an older construction does not automatically follow a redesigned terminal or coil.

Store the pair with the line item. A single “certifications” zip file that is not indexed to part numbers will fail the next audit even when every PDF inside it is genuine. The index is a table: part number, datasheet revision, document title, holder, standard, and the page where the model appears.

What a Certificate Does Not Decide

  • It does not create a mark the datasheet does not show. If the sheet and the PDF are silent, the honest status is that the file was not provided. Do not fill the gap with a remembered file number.
  • It does not move from one product family to another. Contactor, DC breaker, overload relay, and PV disconnect each need their own line.
  • It does not set price, stock, or lead time. Those belong on the quotation.
  • It does not replace application engineering. A certified part can still be the wrong voltage, the wrong polarity, or the wrong trip class for the circuit.
  • It does not turn ISO 9001 into a product listing, and it does not turn a system report into a component certificate.

Ask for the PDF That Names the Part

Send the part number, the destination market, and the document you need: datasheet, declaration, or third-party certificate. Weltrus will reply with the file that matches that part number, or will tell you if that file is not available for it.

Contact Weltrus

Frequently Asked Questions

Does this page list Weltrus UL, TUV, or CE certificate numbers?

No. Certificate numbers, file numbers, and report numbers belong on the PDF that matches the part number. Ask Weltrus for that PDF. A brochure logo, a photograph of a mark, or a number copied from a different series is not evidence for the part on the purchase order.

Is an ISO 9001 certificate the same as a product listing?

No. ISO 9001 is a quality-management certificate for a stated site and scope. A product listing or a Declaration of Conformity names the models and the product standards. Keep the factory certificate and the product file in different folders. Do not use one to stand in for the other.

Can a certificate for a DC contactor cover a DC breaker or a thermal overload relay?

Only if the scope text lists those models. Contactors, circuit breakers, and overload relays are different product standards and different part numbers. A pass on one family does not move to the next family because they ship in the same crate.

What is the difference between a CE Declaration of Conformity and a third-party certificate?

A Declaration of Conformity is the manufacturer’s statement that named models meet named directives and standards. A third-party certificate is issued by a certification body and names the holder, the models, and the standard. Both can be required. Neither is proven by the letters CE printed without the matching PDF.

Which document controls the voltage and current rating?

The datasheet for the part number controls the electrical rating, including any altitude or temperature derating it prints. The certificate shows that a stated scope was assessed to a stated standard. If the datasheet and the certificate scope do not name the same part number, stop and ask for the matching pair.

WhatsApp

+86-13735502672

Talk to our experts

  • We will contact you within 12 hours
  • Don’t worry, we hate spam too!